Filter Udara Untuk Power Plant

DESCRIPTION

This course gives the understanding operation and protection of Electrical Equipment especially in Power Plant of Geothermal and Steam turbine generation.

The main electrical equipment for the above plant are Synchronous generator, Switchgear covering SF6 and Vacuum Power Circuit Breakers, Oil Power Transformer, Transmision and Distribution Conductor, Electric motors, and also Protective Relays. The purpose of this course is to develop a thorough understanding of those electrical equipment.

Discuss safe and proper operation and protection of critical components and application, operation, inspection and testing issues with an overriding emphasis on safety. Case studies covering the main manufacturer’s equipment will illustrate the important practical principles. Other power system protection components will be discussed as well to ensure that main electrical equipment in power plant is understood in the correct context.

 

OBJECTIVE

Participants will strongly learn about the following :

  1. Operation and protection of Power Generator, Switchgear, Oil Power Transformer, and Transmission and Distribution Conductors, Protective Relays.
  2. Inspection and testing of the main electrical equipment

 

COURSE CONTENTS

  1. Boiler Efficiency Calculations
  1. Indirect method (ASME PTC 4-1)
  2. Direct Method
  3. Using simulation tool
  4. Economiser & Superheater effectiveness
  1. Air heater leakage
  2. Steam Turbine Efficiency

Turbine heat rate

Enthalpy drop efficiency

Exhaust loss calculation

Control valve and stage loss

Steam turbine power generation calculation

  1. Condenser Effectiveness

Calculation to find out heat transfer coefficient using HEI 8th& 9thedition method

Calculation of circulating water flow

  1. Feedwater Heater Performance

Calculation of extraction flow

Calculation of terminal temperature difference (TTD) and drain cooler approach (DCA)

Calculation of individual section effectivenes

  1. Boiler Feed Pump Performance

System performance

Boiler feed pump efficiency calculation

  1. Fan Performance
  2. Cooling Tower Performance
  3. Net Plan Heat Rate

 

 

Metode :

  • Presentation
  • Discussion
  • Case Study

 

Waktu & Tempat

No Bulan Minggu Tempat Pelaksanaan
I II III IV V
1 Januari 7 – 9 14 – 16 21 – 23 28 -30 Yogyakarta
2 Februari 4 – 6 11 – 13 18 – 19  26 – 28 
3 Maret 3 – 5 10 – 12 17 – 19  23 – 24 31 Maret – 2 April
4 April 7 – 9  14 – 16  21 – 23 28 – 30 
5 Mei 5 – 6  12 – 14
6 Juni 9 – 11 16 – 16 23 – 25 30 Juni – 2 Juli 
7 Juli 7 – 9  14 – 16  21 – 23 28 – 30 
8 Agustus 4 – 6  11 – 13 18 – 19  25 – 27 
9 September 1 – 3 8 – 10 15 – 17 23 – 25 29 Sept – 1 Okt
10 Oktober 6 – 8 13 – 15 20 – 22 27 – 28 
11 November 3 – 5 10 – 12 24 – 26
12 Desember 1 – 3 8 – 10 15 – 17  22 – 23 29 – 31 

 

Investasi & Fasilitas

  • Rp. 7.500.000 (Non Residential)  
  • Fasilitas : Certificate,Training kits, Lunch, Coffe Break, Souvenir
  • Bagi perusahaan atau instansi yang mengirimkan lebih dari satu peserta dengan judul dan waktu yang sama, maka peserta kedua dan selanjutnya akan dikenakan potongan harga sebesar Rp. 1.000.000 (Satu Juta Rupiah)
  • Bagi peserta luar kota disediakan transportasi antar-jemput dari Bandara/Stasiun ke Hotel khusus bagi perusahaan yang mengirimkan minimal 3 orang peserta)

Tinggalkan Komentar

Alamat email Anda tidak akan dipublikasikan. Ruas yang wajib ditandai *

Scroll to Top
Open chat
Halo
Ada yang bisa Kami bantu?