DESCRIPTION
This course gives the understanding operation and protection of Electrical Equipment especially in Power Plant of Geothermal and Steam turbine generation.
The main electrical equipment for the above plant are Synchronous generator, Switchgear covering SF6 and Vacuum Power Circuit Breakers, Oil Power Transformer, Transmision and Distribution Conductor, Electric motors, and also Protective Relays. The purpose of this course is to develop a thorough understanding of those electrical equipment.
Discuss safe and proper operation and protection of critical components and application, operation, inspection and testing issues with an overriding emphasis on safety. Case studies covering the main manufacturer’s equipment will illustrate the important practical principles. Other power system protection components will be discussed as well to ensure that main electrical equipment in power plant is understood in the correct context.
OBJECTIVE
Participants will strongly learn about the following :
- Operation and protection of Power Generator, Switchgear, Oil Power Transformer, and Transmission and Distribution Conductors, Protective Relays.
- Inspection and testing of the main electrical equipment
COURSE CONTENTS
- Boiler Efficiency Calculations
- Indirect method (ASME PTC 4-1)
- Direct Method
- Using simulation tool
- Economiser & Superheater effectiveness
- Air heater leakage
- Steam Turbine Efficiency
Turbine heat rate
Enthalpy drop efficiency
Exhaust loss calculation
Control valve and stage loss
Steam turbine power generation calculation
- Condenser Effectiveness
Calculation to find out heat transfer coefficient using HEI 8th& 9thedition method
Calculation of circulating water flow
- Feedwater Heater Performance
Calculation of extraction flow
Calculation of terminal temperature difference (TTD) and drain cooler approach (DCA)
Calculation of individual section effectivenes
- Boiler Feed Pump Performance
System performance
Boiler feed pump efficiency calculation
- Fan Performance
- Cooling Tower Performance
- Net Plan Heat Rate
Metode :
- Presentation
- Discussion
- Case Study
Waktu & Tempat
No | Bulan | Minggu | Tempat Pelaksanaan | ||||
I | II | III | IV | V | |||
1 | Januari | 7 – 9 | 14 – 16 | 21 – 23 | 28 -30 | Yogyakarta | |
2 | Februari | 4 – 6 | 11 – 13 | 18 – 19 | 26 – 28 | ||
3 | Maret | 3 – 5 | 10 – 12 | 17 – 19 | 23 – 24 | 31 Maret – 2 April | |
4 | April | 7 – 9 | 14 – 16 | 21 – 23 | 28 – 30 | ||
5 | Mei | 5 – 6 | 12 – 14 | ||||
6 | Juni | 9 – 11 | 16 – 16 | 23 – 25 | 30 Juni – 2 Juli | ||
7 | Juli | 7 – 9 | 14 – 16 | 21 – 23 | 28 – 30 | ||
8 | Agustus | 4 – 6 | 11 – 13 | 18 – 19 | 25 – 27 | ||
9 | September | 1 – 3 | 8 – 10 | 15 – 17 | 23 – 25 | 29 Sept – 1 Okt | |
10 | Oktober | 6 – 8 | 13 – 15 | 20 – 22 | 27 – 28 | ||
11 | November | 3 – 5 | 10 – 12 | 24 – 26 | |||
12 | Desember | 1 – 3 | 8 – 10 | 15 – 17 | 22 – 23 | 29 – 31 |
Investasi & Fasilitas
- Rp. 7.500.000 (Non Residential)
- Fasilitas : Certificate,Training kits, Lunch, Coffe Break, Souvenir
- Bagi perusahaan atau instansi yang mengirimkan lebih dari satu peserta dengan judul dan waktu yang sama, maka peserta kedua dan selanjutnya akan dikenakan potongan harga sebesar Rp. 1.000.000 (Satu Juta Rupiah)
- Bagi peserta luar kota disediakan transportasi antar-jemput dari Bandara/Stasiun ke Hotel khusus bagi perusahaan yang mengirimkan minimal 3 orang peserta)